← Back to documents
Brazil2024-08-02pt

Previsões de Carga Global para o Planejamento Anual da Operação Energética 2ª Rev. Quadrimestral PLAN 2024-2028

Summary

Brazil's energy planning agency (EPE) faces the challenge of accurately forecasting electricity demand for its National Interconnected System (SIN) up to 2028, amidst evolving economic conditions and regional events. The agency has published its second quadrimestral revision of global load forecasts, adjusting projections based on an updated economic scenario, which includes a revised GDP growth for 2024 (2.2%) and consideration of the impact of floods in the state of Rio Grande do Sul. This ongoing planning effort provides critical data for the country's energy operation.

Key Facts

Available with Pro

Structured Key Facts + original PDF link + AI chat

See pricing

Source Document

https://example-government.gov/policy-document-link

AI chat is part of Pro. See pricing →