Electric Vehicle Supply Equipment (EVSE) Site Assessment Report for the U.S. Army Corps of Engineers Chena Site Near Fairbanks, Alaska
Summary
The U.S. Army Corps of Engineers faces the challenge of operating electric vehicles and their charging infrastructure reliably in the extreme cold climate of Fairbanks, Alaska, where temperatures can plummet to -40°C or lower. The National Renewable Energy Laboratory conducted a site assessment for the USACE Chena site, outlining installation requirements and providing cost estimates for EVSE, specifically $53,100 for three 50-A chargers and $89,400 for three 80-A chargers. This project is currently in the planning and assessment phase, with the report serving as a guide for future implementation, highlighting cold-weather considerations for EV performance and charging equipment.
Key Facts