← Back to documents
Australia2026-01en

Infrastructure Design Report Rigid and Prime Mover Truck Electrification Project

Summary

Australia's freight transport sector faces the challenge of decarbonization. This project by Centurion at its Hazelmere depot in Western Australia addresses this by implementing one of the country's first fully off-grid, 100% renewable energy-powered heavy vehicle fleets. The initiative integrates a large rooftop solar system, battery energy storage, and EV charging infrastructure to power 30 electric trucks exclusively with green energy, with the infrastructure now successfully delivered.

Key Facts

Available with Pro

Structured Key Facts + original PDF link + AI chat

See pricing

Source Document

https://example-government.gov/policy-document-link

AI chat is part of Pro. See pricing →